NHS Health Technical Memorandum covering water systems in healthcare premises. Category 5 assumed for many clinical washdown points.
Double Check Valves
ED devices for Fluid Category 3 and the cases where they are no longer sufficient.
Glossary term
NHS Health Technical Memorandum covering water systems in healthcare premises. Category 5 assumed for many clinical washdown points.
Standards & Regulation
ED devices for Fluid Category 3 and the cases where they are no longer sufficient.
Sizing, materials and isolation strategy for protected wholesome supplies.
Reduced pressure zone valves — installation, AIM, annual testing and Fluid Category 4 protection.
Closed heating and chilled-water filling loops, Category 4 protection and RPZ vs break-tank choices.
Need help specifying?
Our technicians can walk the current risk, the required device, and the assembly that satisfies AIM.
Continue reading
Insight
Insight
Insight