Filling loops on non-house systems: RPZ or break tank?

Closed heating and chilled circuits are Category 4. A double check on the filling point is not enough.

Closed heating and chilled circuits are Category 4. A double check on the filling point is not enough.

Non-house closed systems are Category 4. Specify a BA device to AIM or a break tank — never a double check on the filling loop.

Related Regulation Guides

Related Tools

Share this article

Continue reading

Related articles

Insight

Missing test cocks, inverted relief valves, and isolation that makes annual AIM testing impossible.

Insight

Closed heating and chilled circuits are Category 4. A double check on the filling point is not enough.

Insight

When a mechanical device cannot replace a Type A air gap — and how to dimension the weir.