Three common installations where specifiers under-specify protection — and what to fit instead.
A double check is Category 3 maximum. Filling loops on non-house systems, chemical dosing and any hose that can reach a drain need BA or an air gap.
Insight
Three common installations where specifiers under-specify protection — and what to fit instead.
A double check is Category 3 maximum. Filling loops on non-house systems, chemical dosing and any hose that can reach a drain need BA or an air gap.
Related Regulation Guides
Related Tools
Share this article
Continue reading
Insight
Insight
Insight