Regulation guide

Regulations 5 and 6

24 Nov 2026

7

Notification

PropertyValue
Consent response period10 working days
Pump / booster notification thresholdMore than 12 L/min
Large bath thresholdOver 230 litres
Automatically replenished pond / poolOver 10,000 litres
External buried pipeworkLess than 750 mm or more than 1,350 mm deep

Certain plumbing installations must be notified to the local water undertaker before work begins.

In England and Wales, this requirement is established by Regulation 5 of the Water Supply (Water Fittings) Regulations 1999. Equivalent requirements apply under the Scottish Water Byelaws 2014 and the Northern Ireland Water Fittings Regulations 2009.

Notification gives the water undertaker an opportunity to review a proposed installation and identify potential problems before construction starts.

Why Notification Matters

Reviewing an installation at the design stage allows potential compliance issues to be addressed before the work is carried out.

It is considerably easier to amend drawings than to modify a completed installation.

Many of the installations requiring notification involve substantial water consumption or an increased risk of contamination. Notification therefore plays an important part in protecting the water supply and preventing waste.

What Work Requires Notification?

Regulation 5 identifies the types of proposed work that must be notified to the water undertaker.

In England and Wales, these include:

1. New Buildings

The construction of a new building or other structure, excluding ponds and swimming pools, which have separate notification requirements.

2. Non-House Water Systems

The extension or alteration of a water system in premises other than a house.

This includes work in commercial buildings, schools, offices, factories and other non-house premises, subject to the exemptions permitted for Approved Contractors.

3. Material Changes of Use

A material change in the use of premises.

This can include a change in how water is used, particularly where new appliances or processes introduce Fluid Category 4 or 5 contamination risks.

4. Specified Water Fittings and Installations

The following installations are also subject to notification requirements:

  • Large baths: Baths with a capacity exceeding 230 litres, measured to the centre line of the overflow.
  • Bidets: Bidets incorporating an ascending spray or flexible hose.
  • Specified showers: Shower units of a type specified by the regulator under Regulation 5.
  • Pumps and boosters: Equipment drawing more than 12 L/min, connected directly or indirectly to a supply pipe.
  • Reverse osmosis units: Installations incorporating reverse osmosis.
  • Water treatment equipment: Units producing wastewater or requiring water for regeneration or cleaning.
  • Higher-risk backflow protection: RPZ valve assemblies and other mechanical devices intended to protect against Fluid Category 4 or 5 risks.
  • Garden watering systems: Systems not designed to be operated by hand.
  • External pipework: Water systems laid outside a building at depths less than 750 mm or greater than 1,350 mm below ground.

5. Ponds and Swimming Pools

Ponds and swimming pools with a capacity exceeding 10,000 litres require notification where they are designed to be automatically replenished using water supplied by the water undertaker.

These requirements are taken from Regulation 5 for England and Wales. The equivalent Scottish and Northern Ireland requirements should be checked for installations in those jurisdictions.

Notification for Non-House Installations

Notification is particularly important for consultants designing water systems in non-house buildings.

Under Regulation 5, extending or altering a water system in premises other than a house generally requires notification.

This means notification is not limited to installations involving high-risk backflow protection.

Even relatively straightforward alterations to an existing non-house water system can fall within the notification requirements.

However, certain work carried out by an Approved Contractor can be exempt from advance notification.

For houses, an extension or alteration to the existing water system does not automatically require notification solely because the work is being carried out. The specific fittings and other circumstances identified in Regulation 5 must still be considered.

Additional Requirements in Scotland and Northern Ireland

The notification requirements are broadly similar across the UK, but there are differences.

In Scotland and Northern Ireland, additional notifiable installations include:

  • WCs incorporating an ascending spray or flexible hose.
  • Flexible shower hoses or other flexible outlets used in conjunction with a WC.
  • Shower-toilets and bidet-toilets providing personal cleansing from below the WC pan’s spill-over level.
  • Certain pump delivery pipe arrangements.
  • Greywater, recycled water, reclaimed water and rainwater harvesting systems.
  • Water systems intended for firefighting, including domestic sprinkler systems.

In Scotland, systems incorporating a private water supply are also subject to an additional notification requirement.

For projects outside England and Wales, refer to the relevant Scottish Water or Northern Ireland Water guidance.

Who Should Notify the Water Undertaker?

Regulation 5 places the notification requirement on the person proposing the installation.

In practice, a project can involve several parties, including:

  • The building owner or client.
  • The M&E consultant responsible for the design.
  • The main contractor.
  • The plumbing or mechanical subcontractor.
  • The installer carrying out the work.

The important point is that responsibility for submitting the notification should be established early.

For larger projects, the M&E consultant is often well placed to prepare the notification because the design information is already available.

If the water undertaker identifies a problem, the consultant can amend the proposed arrangement before installation begins.

Leaving notification until the installation stage can cause delays where drawings or specifications need to be revised.

What Information Must Be Submitted?

Regulation 5(3) sets out the information required when submitting a notification.

For England and Wales, this normally includes:

  1. The name and address of the person submitting the notification.
  2. The name and address of the person who should receive the water undertaker’s response, if different.
  3. A description of the proposed work or material change of use.
  4. The location of the premises and its existing or intended use.
  5. Plans identifying the relevant parts of the premises, where required.
  6. A diagram showing the proposed pipework and fittings, where required.
  7. The name of the Approved Contractor, where applicable.

Some types of work are exempt from the requirement to provide plans and pipework diagrams.

Many water undertakers provide their own notification forms and online submission arrangements. These should be used wherever available.

Contact details and guidance are available from Water Regs UK — Notification.

How Long Does Consent Take?

The water undertaker has 10 working days to respond to a valid notification under the Regulations.

There are four possible outcomes.

1. Consent Granted

The water undertaker confirms that the proposed work can proceed.

2. Consent Granted with Conditions

The work can proceed subject to specified conditions.

These conditions must be followed, and the client and installer should be made aware of them.

3. Consent Withheld

The water undertaker identifies reasons why consent cannot be granted.

The proposed installation must be reconsidered, and revised details may need to be submitted.

Consent must not be withheld unreasonably.

4. No Response — Deemed Consent

Where the water undertaker does not respond within the statutory 10-working-day period, consent is deemed to have been granted unconditionally.

However, deemed consent does not remove the obligation to comply with the Water Fittings Regulations.

The installation must still meet all applicable requirements.

Allow Enough Time for Notification

Although the statutory response period is 10 working days, notification should ideally take place several weeks before installation is scheduled.

This allows time to address any concerns raised by the water undertaker, amend the design and resubmit information where necessary.

It is also important to retain evidence of when the notification was received.

Where notifications are submitted electronically, use the water undertaker’s designated form, portal or email address and keep the submission acknowledgement.

The date of a valid notification is particularly important where consent is deemed to have been granted because no response was received.

Approved Contractors

Regulation 5(2) provides exemptions from advance notification for certain work carried out by an Approved Contractor.

For England and Wales, the statutory exemptions concern specified work under Regulation 5, including:

  • Extensions or alterations to water systems in premises other than houses.
  • Installation of certain bidets.
  • Installation of specified mechanical backflow prevention devices.

However, the exemption depends on the type of work, the contractor’s approval and any additional conditions imposed by the relevant Approved Contractor scheme or water undertaker.

Using an Approved Contractor does not automatically remove every notification requirement.

For example, the construction of a new building and material changes of use remain subject to notification.

The installation of RPZ valves also requires particular attention.

Even where a statutory notification exemption could apply, an Approved Contractor’s scheme conditions can require notification. In Scotland and Northern Ireland, RPZ valve installations are always notifiable.

The local water undertaker and the Approved Contractor scheme should therefore be consulted before relying on an exemption.

Approved Contractor Certificates

Regulation 6 establishes requirements for Approved Contractors to certify their work.

Following completion, an Approved Contractor must provide the person who commissioned the work with a signed certificate confirming whether the installation complies with the Water Fittings Regulations.

Where the work is notifiable under Regulation 5, a copy of the certificate must also be provided to the water undertaker.

These certificates provide a formal record of the work and its declared compliance.

Approved Contractor schemes include:

  • Water Industry Approved Plumbers’ Scheme (WIAPS).
  • Chartered Institute of Plumbing and Heating Engineering (CIPHE).
  • Association of Plumbing and Heating Contractors (APHC).
  • Scottish and Northern Ireland Plumbing Employers’ Federation (SNIPEF).

The WaterSafe Register provides an online directory of approved plumbing businesses.

WaterSafe is a register, rather than a separate Approved Contractor scheme.

Should Consultants Rely on an Approved Contractor Exemption?

Using an Approved Contractor has advantages, but the exemption should not be viewed simply as a way to avoid the notification process.

There are several considerations.

  • Some types of work remain notifiable regardless of the contractor’s approval.
  • Contractors must comply with their scheme requirements and provide the necessary certificates.
  • The contractor must be approved for the particular type of work.
  • Approval from the water undertaker at the design stage can help identify potential problems before installation.

For consultants, obtaining the water undertaker’s consent can provide greater certainty about the proposed design and any conditions that apply.

Enforcement

The Water Fittings Regulations are legal requirements, not voluntary industry recommendations.

Water undertakers have enforcement powers and can take action where installations do not comply.

Carrying out notifiable work without following the required notification procedure can lead to enforcement action.

Notification should therefore be considered during the design process rather than treated as a final administrative task.

Summary

When planning plumbing work:

  1. Check whether the installation requires notification under Regulation 5 or the equivalent Scottish or Northern Ireland requirements.
  2. Contact the local water undertaker and establish the correct notification procedure.
  3. Submit the required information early, ideally several weeks before installation.
  4. Allow for the statutory 10-working-day consent process.
  5. Ensure all conditions of consent are communicated to the client and installer.
  6. Where an Approved Contractor is used, confirm that any notification exemption applies and obtain the required certificates.

Notification is part of the compliance process. Addressing it early can prevent costly changes and delays once installation begins.

Downloads

Related Insights

Relevant field notes, audit learnings and specification articles.

Tools

Calculators and lookup tools that support this guide.

Applications

Where this regulation topic most commonly appears in real buildings and systems.

Products

Product families commonly specified against this guide.

Quick Links

Downloads

3 documents

Related insights

4 articles

Related tools

1 tool

Applications

3 sectors

Need help specifying?

Our technicians can walk the current risk, the required device, and the assembly that satisfies AIM.

Regulation guide

Insights on

Notification

Tools & calculators

Calculate, look up, decide